At this morning's visit I was lucky enough to find the painters at work, this meant I could sneak in for a peek to see what had been done this week :)
The painter's had been hard at work, and they told me that they would be finished this afternoon. I managed to get a couple of photo's without being in their way and disturbing them.
Painting is pretty much done now, walls needed to have a second coat and that's what they were beginning to do when I left. Doors and downpipes etc are painted and laundry cabinets have been installed.
Plastering has been finished off on kitchen window, but I did notice today that the bulkhead wasn't there for the overhead cupboards in the kitchen, I called my BC and informed her.
Tilers come in on Wednesday and will be finished by the Friday, I am then at fixing stage, and my BC then it's 4 weeks of lots of tradies finishing off their work, plumbers, electricians etc. I might be in before Easter!
Still waiting on those kitchen cabinet doors to arrive.
I finally got to meet our SS this morning, an early start to the day with our catch up on site at 7:30am.
Alfresco door was replaced this morning, kitchen window was also being adjusted into the correct position. Kitchen cabinets have been assembled, well the core of them as we are still waiting for the correct finish on doors and draws.
Laundry cabinets installed, although another mistake where a long bench has been installed and I only wanted the trough as I like a top loading washing machine.
Bathroom and ensuite cabinetry has been installed also. The house is coming along quickly now, my SS that the plasterer's will be back onsite tomorrow and then the painter's and bricklayer's will be in next week.
A few pictures from today's visit.